Snagging software that a client will accept at handover

Severity levels, before-and-after evidence and a closure workflow the PM signs — how to turn snagging from an argument into a document.

14 July 2026 6 min read BuildFlow site team
Snagging software that a client will accept at handover
Buyer’s guide · BuildFlow Insights

Handover disputes are rarely about whether a defect exists. They are about whether it was closed, when, and by whose authority. A snag list that cannot answer those three questions is a list of opinions.

01

Severity has to mean something

A flat list treats a scratched skirting and a failed fire damper as the same item. Severity levels only work if they drive behaviour: critical items block the handover certificate, major items carry a fixed rectification window, minor items can pass to the DLP. Agree that mapping with the client before the first walkthrough, not during the last one.

KEY POINTS
Critical — blocks handover, escalates immediately
Major — fixed rectification window, tracked to closure
Minor — may pass into the defects liability period by agreement
Every item carries a location, a trade and an owner
02

Evidence, captured where the work happened

The before photograph is worth little without the after photograph and the timestamp between them. Both should be captured on site, from a phone, attached to the snag itself rather than sent to someone to file. When closure evidence lives in the record, the handover pack assembles itself.

A snag closed without evidence is a snag that will be raised again.
03

The signature that ends the argument

Closure should require a named person to accept the rectification — normally the project manager, sometimes the client representative. That single step converts the snag register from an internal to-do list into a document you can put in front of a client at handover and have it accepted.

Keep reading

More from BuildFlow Insights

All articles →
What an AI cost agent actually catches on a live fit-out
FIELD NOTE · AI
What an AI cost agent actually catches on a live fit-out
Read article →
Best software for a fit-out company in the UAE: what to look for and how to choose
2026 GUIDE · FIT-OUT
Best software for a fit-out company in the UAE: what to look for and how to choose
Read article →
What giga-project main contractors expect from a subcontractor's systems
MARKET · SAUDI ARABIA
What giga-project main contractors expect from a subcontractor's systems
Read article →